Reference · End-of-line

End-of-line testing for particle counters

An end-of-line setup in series production at AVL DiTest: one station tests twelve particle counters in parallel — with software upgrade, flow calibration and pneumatic leak testing in one sequence.

Services

What the station does

Testing, calibrating and loading software — twelve instruments at a time, directly in production.

  • Parallel testing — twelve particle counters at the same time at one station.
  • Software upgrade — loading and updating the instrument software.
  • Flow calibration — calibration of the flow rate for each instrument.
  • Pneumatic leak test — leak test of the instruments.
  • Further test and calibration steps — functional testing and parameter setting

Technical data

Data sheet

CharacteristicValue
CustomerAVL DiTest
ApplicationEnd-of-line, in series production
Test itemParticle counter
Parallel testing12 instruments at a time
SoftwareUpgrade / flashing of the instrument software
CalibrationFlow (flow rate)
Leak testpneumatic (pressure decay)
Production overviewDashboard: assembly, EOL, calibration, dispatch
Cycle timesuitable for series production (12 in parallel)
Data connectionMES connection, traceability for each instrument

Assumed values. The figures in this table are plausible assumptions for this project and are to be confirmed by engineering before publication.

From the project

The station in operation

Image to follow
Photo available (two test cabinets with production dashboard) — please send it as a file, then I will insert it here.

Series testing in mind?

Tell us what is to be tested, calibrated or flashed at the end of the line — for several instruments in parallel as well.